• Environmental & Geotechnical Drilling

    Project: Bridge Construction, Mars Hill, NC. CEG (Chase Env. Group) personnel were involved in a geotechnical investigation in support of a bridge construction project over the North Toe River in western North Carolina. This project included wireline core drilling in excess of 100 feet total depth all with difficult set-ups, including utilization of a skid-mounted drilling rig and angle drilling set-ups.

    Continue Reading »

  • Underground Storage Tank Removal

    Project: Phillip Morris, Louisville KY. CEG was contracted for the removal of three UST’s, excavation, transportation and disposal of all contaminated materials, the treatment of impacted groundwater and the restoration of the excavated footprint back to original grade. The three UST’s consisted of (2) 30,000 gallon and (1) 15,000 gallon steel lined concrete tanks, which were installed in the 1940’s.

    Continue Reading »

  • Mold, Asbestos & Lead Remediation

    Project: Maysville Community College in Maysville KY. CEG was contracted to provide asbestos, mold abatement and demolition services at the KCTCS Maysville Community College. The interior demolition included ceiling panels, ductwork, water lines, floor coverings, drywall, heating and air units. Asbestos containing materials (ACM) encountered during the demolition activities were removed and disposed.

    Continue Reading »